When comparing construction quotes, most people look at the total price first. That's understandable, but a lower quote does not always mean a lower final cost.

Two contractors can price the same project differently because they have included different work, materials or allowances. One may include waste removal, drainage or exterior work that another lists as an extra. Before comparing the totals, you need to understand what each quotation actually covers.

A low price is not necessarily a warning sign. Contractors have different costs and ways of working. Sometimes, however, a quotation is deliberately priced low to secure the job, with additional work charged later.

Construction costs can also increase for legitimate reasons. Unexpected ground conditions, changes requested by the client and work excluded from the original quotation are different situations. They should not all be treated as unforeseen extras.

Before choosing a contractor, check what is included and excluded, whether the material allowances are realistic, and how additional work will be priced and approved.

A detailed quotation makes it easier to compare contractors and reduces the risk of disagreements once construction has started.