A construction quotation should list the works being priced, describe the materials and finishes allowed for, state what is excluded, set out who is responsible for what, and explain how changes will be priced and approved. Compare quotations on the same scope and the same specification, not on the total alone.
A construction quotation should tell you much more than the final price. For an owner, the useful question is not only what the work costs but what is included for that price.
This matters most when you are comparing several contractors. The checks that go with it are set out in how to choose a builder on the Costa Blanca.
The scope of work should be clear
The quotation should describe clearly what work is being priced. Vague descriptions make quotations hard to compare and lead to disagreements later. If one contractor has priced an item and another has left it out, their totals are not directly comparable.
Materials should be defined
Products that sound similar can differ widely in price, and windows are a good example. Frame system, glazing specification, dimensions, opening systems and installation details all affect the cost. The same applies to flooring, sanitary equipment, electrical installations, insulation and many other parts of a house. The more clearly the specification is defined, the more meaningful the quotation becomes.
Look for allowances
Some items may not have been chosen when the price is prepared, so the quotation may include an allowance for things such as tiles or bathroom fittings. This is normal, but the allowance should be understood: if the product you finally choose costs more, the final price will change.
Understand what is excluded
Exclusions deserve as much attention as inclusions. A swimming pool, landscaping, the kitchen, lighting, utility connections or external works may or may not be part of the price. Do not assume either way; ask.
Check how changes will be priced
Few projects reach completion without a single adjustment, so agree before construction starts how additional work will be priced and approved. A simple sequence avoids most disputes: define the change, establish the cost, approve it, then carry out the work.
Compare like with like
Choosing between quotations by looking only at the total at the bottom of the page can be misleading. The aim is to compare the same scope, specification and quality level. Only then can you judge value properly, and the same logic applies when you compare a budget with what it costs to build on the Costa Blanca.
A detailed quotation takes longer to prepare, but it gives you a much firmer basis for controlling the construction budget.
Nordic Building reviews quotations, budgets and changes for owners on the Costa Blanca as part of our construction project management service, from the first budget to the final account.
Frequently asked questions
-
What is a change order?
A written change to the original contract, such as moving a wall or upgrading a finish. It usually adds cost and time.
-
How much contingency should I have?
Allow a contingency of 10 to 15% of the construction cost as a starting point. How much is needed depends on the project: complex sites, unusual designs and anything still undecided push it up.