A final walkthrough, often called snagging, is your last inspection of a new home in Spain before you accept the handover. Walk every room with your builder, test everything that opens, switches on or runs water, and write each defect on a snagging list. The builder fixes those items before or shortly after handover. Take photos and get the list signed.

Before the walkthrough

Set aside two to three hours in daylight. Bring this checklist, a phone for photos, painter's tape and a phone charger to test the sockets. If you can, bring your project manager or an independent surveyor as well. Then work through the house room by room.

New Home Walkthrough and Snagging Checklist

Exterior

Check that the facade render and paint, the roof and the gutters are undamaged, and that terraces, paths and the driveway have no cracks. Terraces and the ground around the house should drain away from it, and the outdoor lights, taps and pool equipment should all work.

Kitchen

Open and close every cabinet and drawer to make sure they run smoothly, and look over the worktops for chips and stains. Test all the appliances and check under the sink for leaks.

Bathrooms

Flush each toilet and make sure it does not keep running. Hot water should reach every tap, the grout and silicone should be complete, and the extractor fans should work.

All rooms

Every door, window and shutter should open, close and lock. Look for marks and cracks on the walls and ceilings, and for loose or hollow-sounding tiles and gaps in the flooring. Test every socket and switch, and check that the air conditioning or heating reaches every room.

Systems

The electrical panel should be labeled and any smoke alarms should work. You should also receive the manuals for the heat pump, water heater and air conditioning, together with the installers' certificates (boletines) for electricity and water.

After the walkthrough

Mark each issue with painter's tape and photograph it. Write up the snagging list, agree it with the builder and get the completion dates in writing. Collect all the documents: the certificate of completion (certificado final de obra), the first occupation license, the energy performance certificate, warranties and manuals.

Note your guarantee periods too. Spanish law (the Ley de Ordenación de la Edificación) gives one year for finishing defects, three years for defects affecting habitability and ten years for structural defects, so schedule a check of the house before the first year ends.

Frequently asked questions

  • What is a snagging list?

    A list of small defects or unfinished items the builder must fix before the project is complete. Elsewhere it is often called a punch list.

  • Should I hire an inspector for a new house in Spain?

    Yes. An independent surveyor or project manager often finds issues owners miss, even in new builds.